Reference: Manage Severance Process Model - Page 2 for the business process diagram associated with this activity.Group: Severance Event ActivatorActor/Role: CC&BDescription: When Severance process is cancelled, system verifies if there is a need for additional process associated with Severance process cancellation. System checks if disconnection took place while Severance process was active and decides if reconnection process should be initiated fir the service.
| © 2011 Oracle and/or its affiliates. All Rights Reserved |